.jpg) |
Drying of a DN 30” pipeline for Snam Rete Gas in Bardi (PR) |
 |
Verticallaying of a section for Volta S.r.l., connection for Sacci S.p.A. in Greve in Chianti (FI). |
.jpg) |
Welding of a DN 6” pipeline for Snam Rete Gas in Fidenza (PR) |
 |
Laying of a DN 12” methane pipeline for Snam Rete Gas |
.jpg) |
Crossing with controlled horizontal drilling of the river Brenta with a DN 48” water pipeline for Veneto Acque S.p.A. in Piazzola del Brenta (PD) |
 |
Crossing with controlled horizontal drilling of the river Brenta with a DN 48” water pipeline for Veneto Acque S.p.A. in Piazzola del Brenta (PD) |
 |
Crossing with controlled horizontal drilling of the river Brenta with a DN 48” water pipeline for Veneto Acque S.p.A. in Piazzola del Brenta (PD) |
 |
Crossing with controlled horizontal drilling of the stream Grana and of the flood plain of the River Po with a DN 12” pipeline for Snam Rete Gas in Valenza Po (AL) |
 |
Direct pipe for Veneto Acque S.p.A. in Piazzola del Brenta (PD) |
.jpg) |
Assembly of a vent valve for Snam Rete Gas in Borgotaro (PR) |
.jpg) |
Cut off station for Snam Rete Gas |
 |
Excavation with reinforcement for a pipeline of Snam Rete Gas in Turin |
 |
Construction of a DN 6” oil pipeline for Aeronautica Militare Italiana in Orbetello |
 |
Controlled horizontal drilling crossing of the Canal of Malamocco in Venice with a SNAM DN 300” oil pipeline |
 |
Works on the SNAM reduction plant of Fabriano (AN) |
 |
Cut off station on the High Speed Rail line of Modena-Scari |
 |
Crossing of the gully Antanello in Belfiore (VR) with a DN 400” gas pipeline for SNAM, and formation of reefs |